Dec 10, 2020     Wiring, miscellaneous - (4.5 hours)       Category: Electrical
1. Began cleaning up underfloor wires into harnesses. Secured a few harnesses to floor clamps.
2. Connected remaining FCP stick wires to terminal block.
3. Ran autopilot roll servo CWS line to right wing root.
4. Ran FCP seat heat power and grounds.
5. Installed RCP seat heat switch.
6. Installed FCP backup PTT switch.
7. Drilled mounting holes and attached FCP seat heat relay and harness.
8. Cleaned up Main Bus fuseblock wiring.

9. Picked up some interior parts from Jim, my painter. They look great! [Not included in logged time.]


 